Digging Dreams, Building Futures

Titan (Fe-Ti-V), Ontario

Home > Projects > Titan (Fe-Ti-V), Ontario

Vanadiferous Titanomagnetite (VTM)

Vanadiferous Titanomagnetite (VTM) Deposit with Inferred resource1 of 46 Mt grading 48.32% Fe2O3, 0.24% V and 14.88% TiO2.

10,307m of drilling

10,307m of drilling across 39 DDHs plus numerous geophysical and other technical studies completed. Nearly all holes drilled by Randsburg in 2004-2006 were drilled at a 50m spacing.

The main minerals of focus Vanadium and Titanium

The main minerals of focus Vanadium and Titanium - both of which are considered critical minerals in Ontario.

Proximity to infrastructure

Proximity to infrastructure - 18km access road upgrade completed in February 2024; 10km from railway and 3.5km from powerline.

5,672 Ha Claim Package

5,672 Ha Claim Package - including 262 ha of patented land underlying the Titan VTM Deposit

Agreement with an established aggregates company

Agreement with an established aggregates company, provides opportunity for additional revenue through a contract mining arrangement

1 – Inferred Resource estimated in accordance with NI43-101 guidelines in a technical report dated October 23, 2017, prepared by Mine Development Associates for Prophecy Development Corp. (currently Silver Elephant Mining Corp.)

Assessing 2017 Resource Estimate

NI43-101 technical report dated October 23, 2017, prepared by Mine Development Associates for Prophecy Development Corp. (“Technical Report”) provides a historic estimate that remains relevant due to its comprehensive nature and adherence to NI43-101 standards at the time. However, it doesn’t reflect the additional work since 2017. Osprey Advanced Materials Corp. acknowledging the estimate’s limitations and lack of recent verification by a qualified person, does not currently classify it as a mineral resource under current CIM definitions.

A copy of the Technical Report is available here.

CategoryCutoffTonnes% Fe203 % Ti02% V
Inferred40% Fe2O345,996,30048.3214.880.24
Why Vanadium

From Roots to Riches, Unveiling Our Mining Odyssey

In non mauris quis ex placerat iaculis. Maecenas sed auctor arcu. Suspendisse egestas pellentesque quam sit amet cursus. Nulla pharetra euismod tellus eu sollicitudin. Phasellus vehicula, turpis vel fermentum molestie.

250+

Project Completed

410+

Happy Customers

Work Satisfaction
0%
Work Progress
0%

Shaping Earth, Crafting Futures, The Essence of Our Mining Identity

Fill in your details in the form below to sign up for Join Our Mailing List.

Fill in your details in the form below to Download Presentation.